Transient Over Voltage Protection of 160 MW Eti SPP Transformers
Owner's Engineer services to Eti Alüminyum / Cengiz Enerji for the specification and implementation of protection against high-frequency transient overvoltages on the transformers of the 160 MW Eti Solar Power Plant.
High-frequency transient overvoltages originating from switching operations in medium-voltage collector networks impose steep-fronted stresses on transformer insulation and are a recognized failure driver in utility-scale PV plants. Following transformer failures at the 160 MW Eti Solar Power Plant in Konya investigated by NEOS, Cengiz Enerji and Eti Alüminyum retained NEOS Enerji to specify and implement a mitigation solution.
NEOS characterized the switching transients in the plant's MV network, developed the protection concept, specified the mitigation equipment and supervised its implementation as Owner's Engineer between December 2022 and March 2023.
The solution builds on NEOS's proprietary R&D program on high-frequency transient overvoltage surge suppressors.