SFC Reserve Capacity Increase and Grid Compliance Studies of 89.42 MW Menge HPP
Engineering services to Enerjisa for the secondary frequency control reserve capacity increase and grid compliance studies of the 89.42 MW Menge HPP.
Secondary frequency control (SFC) reserve is a remunerated ancillary service, and the reserve capacity a plant may offer must be substantiated through grid code compliance studies. Enerjisa retained NEOS Enerji to increase the SFC reserve capacity of the 89.42 MW Menge hydropower plant and to perform the associated studies.
NEOS modeled the governor and unit control response, verified compliance with the grid code requirements for the additional reserve and supported the client in the compliance process with the transmission system operator.
The study was completed in February 2023; NEOS performed equivalent studies for Enerjisa at the Kavşak Bendi and Arkun hydropower plants.