SFC Reserve Capacity Increase and Grid Compliance Studies of 185.85 MW Kavşak Bendi HPP

Engineering services to Enerjisa for the secondary frequency control reserve capacity increase and grid compliance studies of the 185.85 MW Kavşak Bendi HPP.

Secondary frequency control (SFC) reserve is a remunerated ancillary service, and the reserve capacity a plant may offer must be substantiated through grid code compliance studies. Enerjisa retained NEOS Enerji to increase the SFC reserve capacity of the 185.85 MW Kavşak Bendi hydropower plant and to perform the associated studies.

NEOS modeled the governor and unit control response, verified compliance with the grid code requirements for the additional reserve and supported the client in the compliance process with the transmission system operator.

The study was completed in May 2023; NEOS performed equivalent studies for Enerjisa at the Menge and Arkun hydropower plants.

SFC Reserve Capacity Increase and Grid Compliance Studies of 185.85 MW Kavşak Bendi HPP
NEOS Enerji projects

Projects

Explore all our project references across the energy value chain.
NEOS Enerji

Our Offerings

Find out what services we can provide for you