Re-Design of Water Intake Structure of Khabat TPP
Engineering services for the re-design of the cooling-water intake structure of the 2x150 MW Khabat Thermal Power Plant.
Within the rehabilitation of the 2x150 MW Khabat Thermal Power Plant, NEOS Enerji's engineering team re-designed the plant's cooling-water intake structure.
The re-design resolved the deficiencies of the existing intake and delivered the engineering documentation required for its modification, consistent with the plant's cooling-water demand and operating regime.
The work was executed in September and October 2023 for the Kurdistan Regional Government's Ministry of Electricity, FLT and Akenerji.