RCA Studies for Split-Phase Current Increase of Arkun HPP U3 Generator
Root cause analysis for Enerjisa Üretim of the split-phase current increase of the 78 MW unit 3 generator of Arkun HPP.
Following an increase in the split-phase current of the 78 MW unit 3 generator at Arkun hydropower plant, Enerjisa Üretim retained NEOS Enerji to perform a root cause analysis (RCA).
NEOS evaluated the generator's measurement and protection records, examined the credible causes of the split-phase current increase – a key indicator of stator winding anomalies – and reported on the root cause with recommended actions.
The RCA was carried out between July and September 2021.