Root cause analysis for Cengiz Enerji of the failures of 2x10 MVA and 1x5 MVA 34.5/0.69-0.69 kV transformers at the 160 MW Eti Solar Power Plant.

Following the failure of two 10 MVA and one 5 MVA 34.5/0.69-0.69 kV transformers at the 160 MW Eti Solar Power Plant in Konya, Cengiz Enerji retained NEOS Enerji to perform a root cause analysis (RCA).

NEOS examined the failed units and the operating and protection records, evaluated the electrical stresses the transformers had been exposed to – including switching transients in the MV collector network – and identified the root cause, with corrective actions to prevent recurrence.

The RCA was completed between April and May 2023 and followed NEOS's transient overvoltage mitigation project at the plant.

RCA Studies of 2x10 MVA + 1x5 MVA 34.5/0.69-0.69 kV Transformer Failures
NEOS Enerji projects

Projects

Explore all our project references across the energy value chain.
NEOS Enerji

Our Offerings

Find out what services we can provide for you