RCA Studies of 2x10 MVA + 1x5 MVA 34.5/0.69-0.69 kV Transformer Failures
Root cause analysis for Cengiz Enerji of the failures of 2x10 MVA and 1x5 MVA 34.5/0.69-0.69 kV transformers at the 160 MW Eti Solar Power Plant.
Following the failure of two 10 MVA and one 5 MVA 34.5/0.69-0.69 kV transformers at the 160 MW Eti Solar Power Plant in Konya, Cengiz Enerji retained NEOS Enerji to perform a root cause analysis (RCA).
NEOS examined the failed units and the operating and protection records, evaluated the electrical stresses the transformers had been exposed to – including switching transients in the MV collector network – and identified the root cause, with corrective actions to prevent recurrence.
The RCA was completed between April and May 2023 and followed NEOS's transient overvoltage mitigation project at the plant.