RCA Studies of 280 MVA 400/15.75 kV GSU Transformer Failure
Root cause analysis, repair scope definition and repair risk assessment for YK Enerji following the failure of a 280 MVA 400/15.75 kV generator step-up transformer.
Following the failure of a 280 MVA 400/15.75 kV generator step-up (GSU) transformer at Kemerköy Thermal Power Plant, YK Enerji retained NEOS Enerji to determine the root cause, define the components to be repaired and assess the risks associated with a repair.
NEOS examined the failed unit and the operating and protection records, established the root cause and the extent of damage, and provided the owner with a repair scope and risk assessment as the basis for the repair-versus-replace decision.
The RCA was carried out in July and August 2022 and was followed by the procurement of a replacement 280 MVA GSU transformer.