RCA Studies of 10 MVA 34.5/0.69-0.69 kV Step-up Transformer Failure
Root cause analysis for Eti Alüminyum / Cengiz Enerji of a 10 MVA 34.5/0.69-0.69 kV step-up transformer failure at the 160 MW Eti Solar Power Plant.
Following the failure of a 10 MVA 34.5/0.69-0.69 kV step-up transformer at the 160 MW Eti Solar Power Plant in Konya, Eti Alüminyum and Cengiz Enerji retained NEOS Enerji to perform a root cause analysis (RCA).
NEOS examined the failed unit and the operating and protection records, evaluated the electrical stresses the transformer had been exposed to and identified the root cause, with corrective actions to prevent recurrence.
The RCA was completed between October and November 2022 and triggered the transient overvoltage mitigation project at the plant.