Grid Assessment Study for 160 MW Eti Solar Power Plant
Engineering services to Eti Alüminyum / Cengiz Enerji for the monitoring and assessment of grid transient disturbances at the 160 MW Eti Solar Power Plant.
Eti Alüminyum and Cengiz Enerji retained NEOS Enerji to monitor and assess transient disturbances in the electrical grid at the point of connection of the 160 MW Eti Solar Power Plant in Konya.
NEOS deployed measurement equipment at the plant, analyzed the recorded disturbances and assessed their origin and their potential impact on plant equipment.
The study was completed in November 2022 and informed the transient overvoltage mitigation project at the plant.