Assessment of Excitation Systems of 275.6 MW Göktaş I-II HPPs for Grid Compliance Studies
Engineering services to Aydem Yenilenebilir Enerji for the grid code compliance assessment of the excitation systems (AVR and PSS) of the 275.6 MW Göktaş I-II HPPs.
Grid code compliance requires the excitation systems of generating units – automatic voltage regulator (AVR) and power system stabilizer (PSS) – to meet defined dynamic performance requirements. Aydem Yenilenebilir Enerji retained NEOS Enerji for the grid compliance studies of the 275.6 MW Göktaş I-II hydropower plants in Adana.
NEOS assessed the excitation systems against the grid code requirements, evaluated AVR and PSS settings and dynamic response, and defined the measures required to demonstrate compliance.
The study was completed in May 2023 and forms part of NEOS's portfolio of generator control system and grid compliance studies for hydro, thermal and combined cycle plants.

