C&I Storage Solutions
Cabinet-type storage behind the meter – lower bills, uninterrupted production
Outdoor-rated battery cabinets connected to the main LV board of the facility, with no major change to the existing installation. Power (kW) and energy (kWh) are sized independently, and parallel cabinets scale to multi-MWh.
C&I Storage Solutions
Cabinet-type, outdoor-rated storage for factories, logistics, hospitality, EV charging and critical facilities – connected behind the meter to the main LV board with no major change to the existing installation.
- 372.7 – 418 kWh per battery cabinet; 0.5C and 1C variants
- Parallel cabinets scale to multi-MWh
- Liquid-cooled LFP in an IP55 outdoor enclosure
- Cabinet footprint ~1.7 m²; PCS, access and separation distances are additional
- Separate PCS: power (kW) and energy (kWh) sized independently
- PV coupling and grid-forming options for backup and island operation
- Protection, metering and LV connection adapted to each site
- Commissioning typically within days once site works are complete
What it does for your site
The same cabinet does all of these in turn; the NEOS EMS decides which has priority at any hour. Where the energy is drawn from does not change – when it is drawn does.
Lowers the bill
Charges in low-price hours and discharges in peak hours; the energy line of the bill drops directly.
Keeps production running
On grid loss the load continues without interruption; no downtime, scrap or data loss.
Carries solar into the evening
Midday rooftop surplus is used in the evening peak instead of being sold cheaply or lost.
Prevents demand overrun
Peaks above the contracted capacity are served by the battery; no penalties and no transformer upgrade when a new machine, chiller or charger is added.
Cuts generator hours
Generators run fewer hours at better load; less fuel, longer maintenance intervals, lower emissions.
Ready for grid services
Infrastructure in place for demand-side participation and balancing revenues as markets open.
Key data
Three cabinet models on one LFP cell platform – the choice depends on whether the site needs long discharge, high power or the highest capacity per footprint.
| Parameter | Cabinet · Energy | Cabinet · Power | Cabinet · High Capacity |
|---|---|---|---|
| Rated energy | 372.7 kWh | 372.7 kWh | 418 kWh |
| C-rate · typical duration | 0.5C · 2 h | 1C · 1 h | 0.5C · 2 h |
| Best suited for | Long discharge; bill-driven sites | High power; peak shaving & backup | Highest capacity per footprint |
| DC voltage range | 900 – 1,500 Vdc | 1,165 – 1,500 Vdc | 1,165 – 1,500 Vdc |
| Cell | LFP 280 Ah | LFP 280 Ah | LFP 314 Ah |
| Enclosure · cooling | Outdoor cabinet · IP55 · liquid | Outdoor cabinet · IP55 · liquid | Outdoor cabinet · IP55 · liquid |
| Dimensions (W × D × H) · weight | 1,300 × 1,300 × 2,375 mm · ~4 t | 1,300 × 1,300 × 2,375 mm · ~4 t | 1,300 × 1,300 × 2,375 mm · ~4 t |
| Communication | CAN · RS485 | CAN · RS485 | CAN · RS485 |
| Certification | CE · UN 38.3 · IEC 62619 · UL 1973 · UL 9540A |
Operating range: charge 0 ~ 45 °C, discharge −20 ~ 50 °C. Values per manufacturer technical documentation; final configuration subject to project specification.
Typical sites
Manufacturing plants
Peak-hour bill and demand overrun; the line must not stop.
Cold storage
Temperature must hold during an outage; no product loss.
Hotels and shopping malls
The evening consumption peak coincides with the evening price peak.
EV charging hubs
Several vehicles charging at once exceed the transformer; the battery supports the connection.
Data centres and hospitals
Uninterrupted supply and a soft transfer to the generator.
Organised industrial zones
Shared storage and demand management for several subscribers.
What is added to the site
The battery is commissioned as a cabinet connected to the facility’s main LV board. Protection, metering and the LV connection are adapted to each site; the PCS is a separate unit so that power and energy are sized independently.
~1.7 m²
battery cabinet footprint; PCS, access and separation distances are added in the layout
Days
to commission once civil works, cabling and the grid connection are ready
Multi-MWh
by connecting identical cabinets in parallel