Engineering & Grid Integration
Storage projects are decided at the point of connection
NEOS applies its transmission and distribution engineering practice to every storage system it delivers – from the connection studies and grid-code documentation to the inverter-duty transformer, switchgear and e-house between the DC block and the grid.
Engineering scope
Load-flow & short-circuit studies
Connection capacity, fault levels and equipment ratings verified at the point of connection.
Protection coordination
Relay settings, anti-islanding and transfer-scheme logic coordinated with the existing network.
Grid-code compliance
Reactive-power capability, fault ride-through and frequency response assessed against the applicable code.
Dynamic & transient studies
RMS / EMT simulations with manufacturer PCS models, where required by the grid operator.
Transformer & MV design
Inverter-duty transformer specification, harmonics, earthing and insulation coordination.
SCADA & EMS integration
Standard protocol interfaces to plant SCADA, metering and grid-operator dispatch.
System architecture and scope of supply
The battery is one block of a complete electrical system. Under a turnkey contract NEOS engineers, supplies and integrates every element between the point of connection and the DC block.
Battery system
LFP DC blocks, BMS, thermal and fire systems.
Power conversion
Bi-directional PCS; grid-following or grid-forming.
MV integration
NEOS inverter-duty transformers, switchgear and e-house.
Control
NEOS EMS, SCADA interface, protection and grid studies.
Services
Design, FAT, installation, commissioning and O&M.
Turnkey delivery is the standard NEOS offer: one contract, one counterparty. The division of responsibility between NEOS, the battery and PCS manufacturers and the client is fixed for each project in the contract. Other delivery models – equipment supply, or an integrated package without site works – can be agreed case by case.
Three levels of evidence
Each answers a different question, and none substitutes for the others. An energy-dispatch simulation does not by itself substantiate continuity of supply; transfer performance is confirmed by study and by physical test.
Energy & economic modelling
Method: hourly or one-minute site data – load, PV, tariff and outage scenarios – replayed in the NEOS simulator.
Substantiates: power and energy rating, cycles, savings and payback; screening or decision-grade depending on the data period.
Power-system studies
Method: load flow, short circuit, protection and, where needed, dynamic or transient studies of transfer and islanding.
Substantiates: grid-code compliance, transfer-scheme design and expected transfer times.
Factory & site testing
Method: FAT, site acceptance, transfer tests and capacity and efficiency performance tests.
Substantiates: verified performance against the guaranteed values of the contract.