Battery energy storage containers beside solar panels and wind turbines

Engineering & Grid Integration

Storage projects are decided at the point of connection

NEOS applies its transmission and distribution engineering practice to every storage system it delivers – from the connection studies and grid-code documentation to the inverter-duty transformer, switchgear and e-house between the DC block and the grid.

Engineering scope

Load-flow & short-circuit studies

Connection capacity, fault levels and equipment ratings verified at the point of connection.

Protection coordination

Relay settings, anti-islanding and transfer-scheme logic coordinated with the existing network.

Grid-code compliance

Reactive-power capability, fault ride-through and frequency response assessed against the applicable code.

Dynamic & transient studies

RMS / EMT simulations with manufacturer PCS models, where required by the grid operator.

Transformer & MV design

Inverter-duty transformer specification, harmonics, earthing and insulation coordination.

SCADA & EMS integration

Standard protocol interfaces to plant SCADA, metering and grid-operator dispatch.

System architecture and scope of supply

The battery is one block of a complete electrical system. Under a turnkey contract NEOS engineers, supplies and integrates every element between the point of connection and the DC block.

Grid connectionMV switchgear · transformer · metering→Main busbarLV or MV→BESSDC block · PCS · transformerPV / windrooftop or plant, if anyGeneratorexisting system, if anySite loadsprocess · HVAC · EV charging→SupervisionEMS · SCADA interface · remote monitoring

Battery system

LFP DC blocks, BMS, thermal and fire systems.

Power conversion

Bi-directional PCS; grid-following or grid-forming.

MV integration

NEOS inverter-duty transformers, switchgear and e-house.

Control

NEOS EMS, SCADA interface, protection and grid studies.

Services

Design, FAT, installation, commissioning and O&M.

Turnkey delivery is the standard NEOS offer: one contract, one counterparty. The division of responsibility between NEOS, the battery and PCS manufacturers and the client is fixed for each project in the contract. Other delivery models – equipment supply, or an integrated package without site works – can be agreed case by case.

Three levels of evidence

Each answers a different question, and none substitutes for the others. An energy-dispatch simulation does not by itself substantiate continuity of supply; transfer performance is confirmed by study and by physical test.

Energy & economic modelling

Method: hourly or one-minute site data – load, PV, tariff and outage scenarios – replayed in the NEOS simulator.
Substantiates: power and energy rating, cycles, savings and payback; screening or decision-grade depending on the data period.

Power-system studies

Method: load flow, short circuit, protection and, where needed, dynamic or transient studies of transfer and islanding.
Substantiates: grid-code compliance, transfer-scheme design and expected transfer times.

Factory & site testing

Method: FAT, site acceptance, transfer tests and capacity and efficiency performance tests.
Substantiates: verified performance against the guaranteed values of the contract.

NEOS Enerji

Our Offerings

Find out what services we can provide for you